Tuesday, January 5, 2021

Revcon Rebuild Part 12: Interior Walls

When we purchased the Revcon, we were provided with bamboo for the inner walls. We had intentions of using it and even outfitted the back wall and upper walls of the cab with it. Then the upper cab windows leaked. The bamboo wrinkled like a wood-like product would. When we purchased the Revcon, it was floor to ceiling in mold. We decided to abandon the bamboo. (Yes, the upper windows will be repaired)

We opted to use ABS for the inner walls. We decided on a textured white. It is a huge departure from our original plan but it is waterproof, mold proof and easy to maintain. It is rigid yet flexible so works with the curvature of the walls. And it is easy to cut. To balance out the white, we're planning on wood cabinetry.  

 

 

 

We still have to do the rear wall and upper cab walls. But those will wait. We needed to get the Revcon dried in so we could transition to other awaiting projects. Sadly, this giant will again go to the back burner. I have stopped setting timelines with this project because plans consistently change and other projects need attention before spring/summer.  

We're pleased with the how it turned out. The light tan exterior looks great, the white walls really make the space feel open and bright. Having new lighting and fresh paint really makes the Revcon look new.

Monday, December 14, 2020

Revcon Rebuild Part 10: Year Long Hiatus



It has been a full year since we made any progress on the Revcon. Mike returned last Thanksgiving from a 3 month work assignment. We then dove head first into two truck builds that wrapped up this summer and fall respectively. It felt like the right time to make any progress on the exterior of the Revcon.




Arizona had been unseasonably warm and dry. We took time off work, specifically to finish the exterior paint this past week. So we popped out the 5 remaining windows and did some finish sanding. Only to find out that the following day, southern Arizona would see the first measurable rain in 110 days. Of course.


 

So we taped the five gaping holes and ran errands during our rain delay. In between fits of wind, we managed to tape up and prime the cab. Desert winters just don't have enough daylight.

 

In the meantime I got to work sanding/painting the windows for the driver's side RV section.



We lost so much of this week to rain, humidity and wind. We blindly moved the Revcon to the rear of the shop yesterday to put primer on the driver's side RV and paint on the cab. It is an interesting experience driving a 31' RV blindly, with just the guidance of your spouse, be we did it.


I'm bummed we're, yet again, behind on progress but we still hope to have it dried in as soon as possible. If the afternoon desert winds will cut a break sometime this week, we may just get the driver's side completely done. Hopefully by Christmas (fingers crossed), both sides will be done. Just maybe.

 

We will both be happy to put this part of the renovation behind us. Once the walls go up, windows installed, we can plan out the interior build while we tackle a few projects in between. Sadly, this sandy beast just gets the short end of the stick when it comes to our attention, but a personal project and a paid project are creeping in after the New Year.